user-image
  • Home
  • Login
  • Pensioners List
  • Recognized Hospitals
  • Related Links

DISTRIBUTION OF INTELLECTUAL FEE

CNP01/2014 IMPLEMENTATION OF SUITABLE ANTICORROSIVE COATING SYSTEMS SUGGESTED FOR STEEL CONVEYOR STRUCTURES OF NCTPS, CHENNAI
CNP02/2016 STUDY OF CORROSION AND CORROSION PROTECTION MEASURES FOR SEA WATER STRUCTURES AND SYSTEMS OF KKNPP 3 & 4.
CNP01/2016 TO MITIGATE CORROSION AND SCALE FORMATION IN TG#3 AND TG#4 CONDENSERS.
KH05/2018 MANUFACTURING OF EPOXY AND POLYURETHANE PAINTS FOR COATING OF CONCRETE STRUCTURES
KH03/2018 HIGH PERFORMANCE MOISTURE COMPATIBLE CORROSION RESISTANT PROTECTIVE COATING SYSTEM
KH01/2018 CORROSION INHIBITING ADMIXTURE TO RESIST CORROSION OF REBARS EMBEDDED IN CONCRETE (FOR ALL TYPES OF CEMENTS) EXPOSED TO MARINE, AGGRESSIVE, MODERATE AND MILD ENVIRONMENTS
KH04/2018 CORROSION RESISTANT INHIBITIVE ADMIXTURE FOR REINFORCEMENT BARS EMBEDDED IN CONCRETE
KH01/2019 CORROSION RESISTANT INHIBITIVE ADMIXTURE FOR PORTLAND POZZALONA CEMENT (CRPPC)
SSP04/2016 DESIGN AND DEVELOPMENT OF 5 NUMBERS OF, HIGHER PRESSURE, 0.5 NM3 / H CAPACITY PEM - BASED WATER ELECTROLYSER STACK FOR THE GENERATION OF HYDROGEN
SSP02/2015 EVALUATION OF LI-ION CELLS
SSP13/2017 FEASIBILITY STUDIES ON HYDROGEN GENERATION USING HYDRAULIC SHOCK PROCESS
SSP08/2018 VALIDATION OF PROTECTIVE COATING UNDER C5-M FOR HEMPEL PAINTS (INDIA) PRIVATE LIMITED
SSP20/2018 EVALUATION OF PROTECTIVE COATING OF AR ENTERPRISES
SSP06/2018 HYDROGEN EMBRITTLEMENT TESTING OF STEEL SPECIMENS
SSP13/2014 DEVELOPMENT OF CORROSION DATABASE FOR THE COPPER CHROMIUM PLATED COMPOUNDS
TSP05/2017 TRAINING ON BATTERIES WITH EMPHASIS ON LI-ION BATTERY
TSP04/2016 TESTING OF 2 V / 100 AH & 2 V / 200 AH LEAD ACID CELLS AS PER IS 1651:2013.IS 1652:2013& IEC 60896-11
TSP07/2017 EVALUATION OF LI-ION CELLS
TSP01/2017 TESTING OF 12 V / 150 AH TUBULAR TYPE LEAD ACID BATTERY
TSP09/2018 TESTING OF LIQUID PAINT FOR RALI ENGINEERING WORKS PVT. LTD., AS PER SPESIFICATION

staff members may download the Notices by clicking the respective Project Number and treat as an Individual copy. Objections/representations if any may be sent to the Chairman, Standing Distribution Committee on or before 25.02.2021.

© 2019 CSIR-CECRI. All rights reserved.